१. Head of Department of Urban Development and Building Construction is:
- Secretary
- Director General
- Under secretary
- Director
Report this question
२. A contract is:
- a bargain between two parties
- a risk of the contractor
- a money for the contractor
- an agreement to do something especially one that is enforceable by law
Report this question
३. Service connections to consumer houses are generally provided with:
- copper pipes
- hume pipes
- galvanized iron pipes
- none of these above
Report this question
४. Intercepting trap is:
- A trap with water seal at junction of house drain and public sewer
- A trap placed at floor with water seal
- A trap placed in between two houses
- A trap placed by public sanitary authority at roads
Report this question
५. The minimum size of the pipe connecting to a septic tank is of :
- 50mm
- 150mm
- 100mm
- 200mm
Report this question
Timer Paused !!! Tap on Resume button to resume your model test.
Resume
Total Questions:- 5
Attempted Questions:- 0
Remaining Questions:- 0
Are you sure you want to submit ?
Submit
Cancel